Local Project Questions · 2 min read

Why We Proposed More Than Replacing the Flashing

We explained how the flashing was attached, why replacing it involved stucco removal, and how paint matching related to the caller’s goal for the finished appearance.

← Back to Blog

The caller wanted to know whether we could replace the flashing by removing a board or whether an entire section of stucco would need to come out. The house was newly built. The caller wanted the appearance restored, not just the bent metal replaced.

So you're not talking about cutting all the stucco out 8ft, you're just talking about going, removing that board and replacing that flashing or what?

Local caller

We explained that the bent flashing was L-shaped, with approximately three inches extending beneath the stucco. It was also secured with many nails. For this repair, the overlap beneath the stucco and the way the metal was attached were the reasons our proposed flashing replacement included stucco removal.

It goes beyond the stucco, underneath the stucco, like three inches.

Our response

So to pull that out, we'll have to remove the whole eight feet.

Our response

Removing the full eight-foot section would mean removing stucco too. We also discussed removing only half, but questioned whether the owners would be satisfied with that result. The caller made the priority clear: because the house was new, the finished appearance mattered. Our discussion of how much to remove centered on that concern.

I want it like nothing happened.

Local caller

The caller also wanted the paint matched but did not know the existing color. We explained where we would take the sample for this job. Rather than use the stucco, we would obtain the paint-match sample from the metal.

Because I don't know what that paint color is.

Local caller

Yes, we would pull it off of the metal, not off of the stucco, but off of the metal.

Our response

We needed a flat surface for the paint sample, which was our reason for choosing the metal. The caller also asked how long the repair would take. Our estimate was two days: one day for the work, followed by painting the next day when dry.

One day and then the next day when it's dry painting.

Our response

The main decision was whether our proposed removal and finishing work addressed the appearance the caller wanted. We explained the removal scope, where the paint sample would come from, and the expected order of work. Those details described our repair plan. They did not establish a completed result or confirm that the finished repair ultimately matched.

Discuss the finished appearance you want with us, including how the proposed flashing removal, stucco work, and paint matching relate to that result.

Ready to Get Started in Davis?

Contact Skyline Stucco Davis today for a free, no-obligation estimate on your project.

Get Your Free Quote